QUICK COMMERCE — STORE OR CLUSTER COVERAGE REVIEW ILLUSTRATIVE BLANK TEMPLATE — NOT ACTUAL RESULTS Use this sample structure to agree a planning or review method. All fields are intentionally blank. It does not describe an existing Sparrow programme, confirmed capacity, contractual service level or promised outcome. Agree definitions, scope and responsible teams before use; leave unknowns unresolved. Use aggregate records or non-personal record references, not Captain or passenger personal details. SCOPE TO AGREE Store or cluster and review period: New location or existing network review: Coverage windows and required concurrent capacity: Resources already available / resources still to confirm: Store, platform dispatch and fleet responsibilities: Review owner/team and date: READINESS CHECK Vehicle suitability and agreed readiness criteria: Captain coverage and local support to confirm: Energy arrangement, access and provider to confirm: What the new location needs before starting: Effect on existing-location coverage, with source and owner: Unresolved condition / team able to decide / review date: DEFINITIONS AND RECORDS Required hours: agreed concurrent capacity multiplied by each coverage window. Covered hours: available Captain-and-ready-suitable-vehicle time meeting the agreed requirement, capped at the requirement within each window. A surplus in one window does not erase a gap in another. Coverage ratio: covered hours divided by required hours for the same store/cluster and period; leave uncalculated when the requirement is undefined or zero. Required hours / source / owner: Covered hours by window / source / owner: Coverage ratio / uncovered windows: Store readiness and dispatch measures, recorded separately: INTERRUPTION AND CHANGE REVIEW Exception reference / affected location and window: Opened / acknowledged / responsible team: Action considered / capacity or support still to confirm: Resolution time / evidence / remaining dependency: Requested change to coverage / feasibility reviewer / decision: No change or replacement is assumed available until confirmed. COST AND NEXT DECISION Cost categories included and excluded / record owner: Comparable review period and any changed definitions: Action proposed / decision owner / next review: Missing evidence and attribution limits: Discuss the scope: https://www.sparrowmobility.com/contact